PARTNERSHIPS

Bring the technology. We have the thing most construction technology never gets: a line that repeats.

The reason so much construction technology dies is not that it does not work. It is that it gets one pilot, on one unusual project, with no comparable second run, and the result is a case study nobody can interpret.

Al Fursan runs roughly 4,300 comparable cycles. A technology tested there is tested against a control group, several thousand times, on real ground, by real crews, under real time pressure.

Test, prove, scale. Evidence is the gate between each one.

STRUX formwork manufacturing conceptSTRUX MANUFACTURING · BEING BUILT FOR 2027
P900 floor-tiling robotCONSTRUCTION ROBOTICS · BEING BUILT FOR 2028
TAKT production-twin visualizationTAKT · RUNNING TODAY
TECHNOLOGY INTO PRODUCTIONTEST · PROVE · SCALE

A PATH FROM TECHNOLOGY TO REPEATED PHYSICAL USE

What we offer partners

  • Access to real construction workflows, not a demonstration environment
  • A process that repeats often enough that results can be compared rather than argued about
  • Manufacturing and site integration capability
  • Access to agreed production evidence, including the measurements that disagree with you
  • A route from pilot to scaled deployment when performance is proven
  • Applications spanning homes, hotels, development programs and contractor delivery
  1. 01Technology
  2. 02Controlled use
  3. 03Measured result
  4. 04Scale decision

Performance evidence is the gate between each stage. It is a real gate.

Partnership areas

Where a partnership is most likely to pay

01

Building systems and materials

Improve the physical system, component performance, or how manufacturable the building actually is.

02

Robotics and machinery

Integrate repeatable physical execution into a line that already knows its own rhythm, instead of demonstrating a machine in isolation.

03

Manufacturing

Expand the precision, scale and adaptability of reusable construction systems. This is where STRUX lives.

04

Data and predictive intelligence

Strengthen the production twin, the analytics, machine vision, and the controlled path toward autonomy.

05

Development and market partnerships

Apply the system to housing, hospitality and large development opportunities.

Announced memoranda of understanding

Signed

At the Saudi-Chinese Construction Forum, TBS announced memoranda of understanding with Partner Robotics and Asia Aluminum Group Systems.

Closing

The best construction technology should survive contact with production.

Most of it never gets the chance. Bring us something and we will give it 4,300 comparable cycles to prove itself.