Aerial TBG project photography showing an active housing program

PROJECTS

Proof should be measured in finished buildings.

Explore how TBG has applied industrialized construction across housing and finishing programs. Every published case study identifies the client requirement, TBG's exact scope, the production method used and the verified result.

TBG project photography · additional case-study data under verification

FROM INDIVIDUAL HOMES TO LARGE HOUSING PROGRAMS

The requirement. The scope. The production method. The verified result.

RESIDENTIAL UNITS COMPLETED5,000+
SQUARE METERS BUILT800,000+
YEARS10+
Aerial view of the Ebayya project in Riyadh, showing rows of villas under construction beside completed roads and public spaces
01

Ebayya at Al Forsan, Riyadh

Requirement

1,075 villas delivered on a fixed 16-month program.

Scope

Structural core and shell, three levels per villa, across four villa types.

Method

A repeating production cycle, not a sequence of one-off builds. One set of formwork is assembled, poured, stripped and moved to the next villa, so structure advances on a fixed rhythm instead of waiting on deliveries. TAKT runs on that rhythm, recording every set movement and every pour as it happens, so the line's rate is measured rather than reported, and a delay surfaces while there is still time to act on it.

Result

Three villas per day, sustained, and counting.

Ongoing project

01

Crown Prince scheme

Units
505 units
Location
Makkah, Saudi Arabia
Status
Ongoing

Completed programs

Elevated view of the Wadi Alsail project in Al Taif, showing concrete villa structures at different stages of construction
01

Wadi Alsail

Units
1,208 units
Location
Al Taif, Saudi Arabia
Duration
10 months
Status
Completed
Aerial view of the Al Forsan project in Riyadh, showing completed and in-progress multistory residential buildings
02

Al Forsan

Units
660 units
Location
Riyadh, Saudi Arabia
Duration
8 months
Status
Completed
Top-down aerial view of the Al Ared project in Riyadh, showing rows of villa structures under construction
03

Al Ared

Units
80 villas
Location
Riyadh, Saudi Arabia
Duration
4 months
Status
Completed

ADDITIONAL EVIDENCE IN REVIEW

Client permission, TBG scope, production method, delivery data and the verified result are checked before an additional project record is published.

01Client requirement
02TBG scope
03Production method
04Verified result

Additional case studies will appear here only when the full evidence chain is ready for public use.

Discuss your project